Document Index for The Walton Company

Cynthia Coulter Mulvihill, Esq. SBN 171909
Sheral A. Hyde, Esq. SBN 131452

LAW OFFICES OF CYNTHIA COULTER MULVIHILL, APC
150 South Los Robles, Sixth Floor
Pasadena, California 91101

(626) 584-3663; fax (626) 584-3662

Cmulvihill@cmsynergy.com

 

Attorneys for Defendants, Cross-Defendants and Complainants,

THE WALTON ASSOCIATED COMPANIES dba THE WALTON COMPANY

 

SUPERIOR COURT OF THE STATE OF CALIFORNIA

COUNTY OF LOS ANGELES, CENTRAL DISTRICT

 

SHERMAN OAKS SENIOR CITIZEN HOUSING CORPORATION, et al.,

 

                        Plaintiffs,

 

            v.

 

THE WALTON ASSOCIATED COMPANIES, et al.,

 

                        Defendants.

_________________________________

 

AND RELATED CROSS ACTIONS.

 

)
)
)
)
)
)
)
)
)
)
)
)
)

 

CASE NO.:  BC 228212

 

THE WALTON COMPANY’S NOTICE OF PARTIAL COMPLIANCE RE DOCUMENTS DEPOSITED PURSUANT TO CASE MANAGEMENT ORDER

 

 

 

INDEX OF DOCUMENTS DEPOSITED

Bates No.

Description

Date

1-10

Job Meeting #19

December 6, 1994

11-19

Job Meeting #18

November 29, 1994

20-28

Job Meeting #17

November 22, 1994

29-36

Job Meeting #15

November 1, 1994

37-44

Job Meeting #14

October 25,1994

45-53

Job Meeting #13

October 18, 1994

54-62

Job Meeting #12

October 11, 1994

63-71

Job Meeting #11

October 4, 1994

72-81

Job Meeting #8

September 13, 1994

82-90

Job Meeting #7

September 6, 1994

91-101

Job Meeting #6

August 30, 1994

102-111

Job Meeting #5

August 23, 1994

112-116

Job Meeting #4

August 16, 1994

117-121

Job Meeting #4

August 16, 1994

122-129

Job Meeting #3

August 9, 1994

130-139

Job Meeting #2

July 19, 1994

140-145

Job Meeting #1

July 19, 1994

146-153

Job Meeting #44

July 25, 1995

154-162

Job Meeting #42

July 11, 1995

163-171

Job Meeting #40

June 27 1995

172-180

Job Meeting #38

June 6, 1995

181-188

Job Meeting #37

May 30, 1995

189-196

Job Meeting #35

May 9, 1995

197-204

Job Meeting #34

May 2, 1995

205-212

Job Meeting #32

April 18, 1995

213-220

Job Meeting #30

March 7, 1995

221-228

Job Meeting #29

February 28, 1995

229-236

Job Meeting #28

February 21, 1995

237-244

Job Meeting #27

February 14, 1995

245-252

Job Meeting #26

February 7, 1995

253-260

Job Meeting #25

January 24, 1995

261-268

Job Meeting #24

January 17, 1995

269-276

Job Meeting #23

January 3, 1995

277-284

Job Meeting #22

December 27, 1994

285-292

Job Meeting #21

December 20, 1994

293-301

Job Meeting #20

December, 13, 1994

302-309

Job Meeting #65

January 23, 1995

310-317

Job Meeting #62

December 12, 1995

318-326

Job Meeting #61

December 5, 1995

327-334

Job Meeting #59

November 14, 1995

335-342

Job Meeting #56

October 31, 1995

343-350

Job Meeting #54

October 17, 1995

351-358

Job Meeting #53

October 10, 1995

359-366

Job Meeting #52

October 3, 1995

367-375

Job Meeting #51

September 19, 1995

376-384

Job Meeting #49

August 29, 1995

385-392

Job Meeting #48

August 29, 1995

393-400

Job Meeting #47

August 22, 1995

401-408

Job Meeting #46

August 8, 1995

409-416

Job Meeting #45

August 8, 1995

417-460

General Decision Number CA940002

May 23, 1994

461-466

Phase II (Housing) Other Fees

December 27, 1993

467-472

Phase II (Housing) Other Fees

December 27, 1993

473

Letter from Alan Ross to Clyde Anderson

May 9, 1994

474-477

FAX to Alan Ross from Clyde Anderson

May, 18, 1994

478

Phase I (Garage) Other Fees

May 17, 1993

479

Phase I (Housing) Other Fees

May 17, 1993

480-481

Exhibit “F” Promissory Note

April 15, 1994

482

Exhibit “C” Residual Receipts Note

 

483-484

Rider “A”

April 14, 1993

485-521

Const. Loan Agreement Between LA and Sherman Oaks Services

April 15, 1994

522

FAX from Alan Ross to Clyde Anderson

June 1, 1994

523-526

FAX to Alan Ross from Clyde Anderson

May 16, 1994

527

FAX cover to Howard Katz from Clyde

 

528-533

Phase II (Housing) Other Fees

December 27, 1993

534-539

Phase II (Housing) Other Fees

December 27, 1993

540-545

Phase II (Housing) Other Fees

December 27, 1993

546-551

Phase II (Housing) Other Fees

December 27, 1993

552-557

Phase II (Housing) Other Fees

December 27, 1993

558-563

Phase II (Housing) Other Fees

December 27, 1993

564-569

Phase II (Housing) Other Fees

December 27, 1993

570-575

Phase II (Housing) Other Fees

December 27, 1993

576-581

Phase II (Housing) Other Fees

December 27, 1993

582-587

Phase II (Housing) Other Fees

December 27, 1993

588-590

FAX to Howard Katz From Clyde Anderson

June 21, 1993

591-593

FAX to Howard Katz from Clyde Anderson

June 18, 1993

594

Exhibit “E” Schedule of Approved Total Development Costs and Funding Sources

January 5, 1994

595

Exhibit “D” Schedule of Performance

May 17, 1993

596-598

FAX to Howard Katz Re: Installation of Utilities

October 27, 1994

599-602

FAX to Howard Katz Re: Installation of Utilities

October 27, 1994

603-605

Sub Contractor Control Forms

March 6, 1995

606-607

Sub Contractor Control Forms

March 3, 1995

608

Sub Contractor Control Forms

January 23, 1995

609-610

Sub Contractor Control Forms

February 27, 1995

611-612

Sub Contractor Control Forms

January 23, 1995

613

Projected Offsite Cost

June 9, 1993

614

Housing and Urban Development (Contractors / Mortgagor’s Cost Breakdown)

July 15, 1992

615-616

FAX to Federal Housing Commissioner Re: Request for Construction Changes (Fire Sprinklers)

March 8, 1995

617

Letter to Howard Katz Re: Parking Structure

March 8, 1995

618-620

Sub Contractor Control Form

March 6, 1995

621

Request for Construction Changes on Project Mortgages Re: Lavatories

 

622

Request for Construction Changes on Project Mortgages Re: Framing Contract for Delta 6

 

623-626

Sub Contractor Control Forms

March 6, 1995

627-629

Letter to Howard Katz Re: Changes to form 2328 with attachments

January 21, 1994

630

Form 2328 (Contractors / Mortgagor’s Cost Breakdown

December 28, 1993

631

Projected Offsite Costs

June 9, 1993

632

Form 2328 (Contractors / Mortgagor’s Cost Breakdown

December 28, 1993

633

Projected Offsite Costs

June 9, 1993

634-638

Dickens Senior Housing Estimate

May 20, 1993

639

Letter to Howard Katz Re: Cash Flow Requirements and Schedules

May 20, 1993

640-643

Attachment to 639 (Dickens Senior Housing Estimate)

May 20, 1993

644-647

Attachment to 639 (Schedule)

May 19, 1993

648

From 2328 (Contractors / Mortgagor’s Cost Breakdown)

April 26, 1993

649

Projected Offsite Cost

April 26, 1993

650

Letter to Howard Katz Re: Form 2328

April 26, 1993

651-653

Dickens Senior Housing Estimate

April 26, 1993

654-656

Dickens Senior Housing Estimate

April 5, 1993

657

Projected Offsite Costs

April 4, 1993

658-660

Housing Estimate

April 5, 1993

661-671

Letter to Howard Katz Re: Other Fees (11 Copies)

April 1, 1993

672-674

Housing Estimate

April 5, 1993

675

Projected Offsite Costs

April 1, 1993

676-682

Letter of Transmittal of form 2328, Housing Estimate, and projected Offsite Costs to Howard Katz

April 9, 1993

683-686

Housing Estimate

April 1, 1993

687-690

Housing Estimate

April 1, 1993

691-692

Garage Cost Adjustment

March 31, 1993

693

Form 2328 (Contractor / Mortgagor’s Cost Breakdown)

November 24, 1992

694-695

Bonds (Garages)

 

696-697

Letter to Howard Katz Re: Other Fees w/ Attachment of Projected Offsite Costs

November 20, 1992

698-700

Housing Estimate

November 24, 1992

701

Letter to Howard Katz Re: Cost Estimate

June 25, 1992

702-704

Housing Estimate Attached to 701

June 22, 1992

705

Letter from Lynn & Schaller Insurance Re: Bond Approval Attached to 701

May 1, 1992

706-720

Form 2328 (Contractor / Mortgagor’s Cost Breakdown)

July 15, 1992

721-723

Housing Estimate

June 22, 1992

724-725

Letter to Howard Katz Re: Other Fees w/ Attachments

December 15, 1992

726

Letter to Alan Ross Re: Liability Insurance

May 2, 1994

727

Sub Contractor Control Form

March 6, 1995

728-752

Construction Contract

June 6, 1994

753-762

Housing Estimate and Schedule to Howard Katz via FAX

May 20, 1993

763-772

Cost Breakdown, Other Fees, and Housing Estimate to Alan Ross via FAX

June 13, 1994

773-775

Plan Check and Assignments Checklist to Howard Katz

April 5, 1994

776

Letter to Howard Katz Re: Church parking for Garage

April 5, 1994

777

Tax Registration Certificate

February 26, 1994

778-785

Grading Permit Application and Import Export Documents

April 12, 1994

786-788

FAX to Alan Ross Re: Estimate Job Sheets

June 15, 1994

789-794

Housing Garage Time Table

 

795

Exhibit “E” (Schedule of Approved Total Development Costs)

May 5, 1994

796-797

Closing Document Checklist for Parking Garage

June 14, 1994

798

Offsite Demolition Contract

 

799-807

Construction Contract

June 15, 1994

808-813

Housing Garage Time Table

 

814-816

Concrete Time Table

April 26, 1994

817

Phase II Housing Other Fees

 

818-822

Housing Estimate

December 27, 1993

823-824

FAX Re: Funding

March 9, 1994

825

Projected Offsite Cost

December 27, 1993

826-831

Letter of Transmittal with Form 2328, Housing Estimate, and Projected Offsite Costs

April 15, 1993

832-833

Project Contact Form

April 7, 1994

834-837

Letter to Howard Katz Re: Minority Certified Contractors

July 6, 1993

838

Subcontractor Survey Form (Blank)

 

839-842

Letter of Transmittal to Julia Copely Re: Minority Contractors

July 6, 1993

843-847

Housing Estimate

May 20, 1993

848

Projected Offsite Costs

April 8, 1993

849

Contractor / Mortgagor’s Cost Breakdown

April 26, 1993

850

Projected Offsite Costs

April 26, 1993

851-853

Housing Estimate

April 7, 1993

854-856

FAX to Howard Katz Re: Projected Offsite Costs (Revised)

April 8, 1993

857

Contractors / Mortgagor’s Cost Breakdown

June 14, 1993

858-861

FAX to Carolyn of Menorah Form 2328 and Projected Offsite Cost

December 28, 1993

862

Letter to Howard Katz Re: Additional Drywall for Soundproofing

December 27, 1993

863-867

Housing Estimate

December 27, 1993

868

Contractors / Mortgagor’s Cost Breakdown

December 28, 1993

869

Projected Offsite Costs

June 9, 1993

870

Contractors / Mortgagor’s Cost Breakdown

December 28, 1993

871

Projected Offsite Costs

June 9, 1993

872

Phase II (Housing) Other Fees

 

873

Projected Offsite Costs

June 9, 1993

874-878

Housing Estimate

December 27, 1993

879

Contractors / Mortgagor’s Cost Breakdown

December 28, 1993

880

Projected Offsite Costs

June 9, 1993

881

Phase II (Housing) Other Fees

 

882

Projected Offsite Costs

June 9, 1993

883-887

Housing Estimate

December 27, 1993

888

Letter to Howard Katz Re: Sheet Plans

December 13, 1993

889

Contractors / Mortgagor’s Cost Breakdown

November 30, 1993

890-891

FAX of Housing Estimate

June 10,1993

892-893

Housing Estimate

December 2, 1993

894

Offsite Housing Costs

November 30, 1993

895

Contractors / Mortgagor’s Cost Breakdown

November 30, 1993

896-897

Letter of Transmittal to Howard Katz Re: Form 2328

June 14, 1993

898-899

Projected Offsite Costs

June 9, 1993

900

Cash Flow Estimate

June 10, 1993

901-902

FAX to Laury Chasin Re: Senior Housing (Pages Missing)

April 8, 1993

903-905

FAX to Howard Katz Re: Projected Offsite Costs

April 8, 1993

906-907

FAX to Howard Katz Re: Submittal of Documents

August 3, 1993

908

FAX to Clyde Anderson Re: Parking Issues

August 10, 1993

909-912

FAX to Laury Chasin Re: Projected Offsite Costs

August 4, 1993

913

Contractors / Mortgagor’s Cost Breakdown

April 26, 1993

914

Projected Offsite Cost

April 26, 1993

915

Contractors / Mortgagor’s Cost Breakdown

December 27, 1993

916

Projected Offsite Cost

June 9, 1993

917

Contractors / Mortgagor’s Cost Breakdown

December 27, 1993

918

Letter of Transmittal (No Attachment)

December 27, 1993

919

Letter of Transmittal (No Attachment)

December 30, 1993

920

Letter to Howard Katz Re: Reimbursement of Costs

October 18, 1993

921

Offsite Costs (HUD Garage)

 

922-927

Letter to Howard Katz Re: Spread sheet (enclosure: Housing Estimate)

December 23, 1993

928

Projected Offsite Costs

April 8, 1993

929

Contractors / Mortgagor’s Cost Breakdown

June 14, 1993

930-931

Schedule Timeline

March 31, 1993

932-933

Garage Costs

March 31, 1993

934

Letter to Joe Hirsh Re: Rising Lumber Costs

April 5, 1993

935

Contractors / Mortgagor’s Cost Breakdown

April 5, 1993

936

Projected Offsite Costs

April 1, 1993

937-942

Framing Proposal from Lee Bolin & Associates

October 5, 1992

943-948

Housing Estimate

April 5, 1993

949

Projected Offsite Costs

April 8, 1993

950-951

Parking Structure Costs

April 1, 1993

952-953

Sub Contractor Control Form

March 6, 1995

954-956

FAX to Laury Chasin Re: Garage Costs

March 29, 1993

957

Projected Offsite Costs

November 18, 1992

958-961

Plan Changes for Delta 1 Spec Change

November 24, 1992

962

Offsite Costs Attributed to HUD garage

 

963-965

Contractors / Mortgagor’s Cost Breakdown

November 24, 1992

966-979

Job Cost Report

March 10, 1993

980-984

FAX’s of Letter to Joe Hirsch Re: Rising Lumber Costs

April 5, 1993

985-990

FAX to Howard Katz and Jack Parrish Re: Pricing Requested

November 6, 1992

991-993

Housing Estimate

November 24, 1992

994-997

Memorandum of Plan Changes to Bill Raymond Sr.

November 24, 1992

998-1001

Memorandum of Plan Changes to Bill Raymond Sr.

November 24, 1992

 

1002-1008

Quotes for Lower Garage Concrete, Electric, Sprinklers

 

1009-1013

Contractors / Mortgagor’s Cost Breakdown

November 24, 1992

1014-1028

Job Cost Report

January 15, 1993

1029-1043

Job Cost Report

November 16, 1992

1044-1046

Housing Estimate

November 24, 1992

1047-1050

Letter to Howard Katz Re: Cost Breakdown of Parking Structure

January 21, 1993

1051-1052

FAX to Howard Katz Re: Form 2328 Revision

November 24, 1992

1053-1054

Letter of Transmittal to Howard Katz Re: Projected Costs

November 24, 1992

1055-1057

Housing Estimate

November 24, 1992

1058-1060

Housing Estimate

November 24, 1992

1061

List of Appliances

September 23, 1992

1062

Letter to Howard Katz Re: Possible Savings

June 22, 1992

1063-1067

Memorandum to William Raymond Jr. Re: Letter from city of LA and Civil Engineer

 

1068-1069

FAX to Clyde Anderson Re: Security System

November 10, 1992

1070

Letter to Clyde Anderson Re: Request to Modify Details of Concrete

September 11, 1992

1071-1072

Handrail Bracket Data Sheets

 

1073-1074

Heat Pump Details/Drawings

 

1075

Letter to Howard Katz Re: Possible Cost Savings

June 22, 1992

1076

Possible Changes to Specifications

 

1077-1083

Letter to Howard Katz Re: Concerns in Bidding Plans

June 18, 1992

1084-1085

Price Additions and Savings

 

1086-1087

Extra Items List

October 6, 1992

1088-1089

Section 12500: Window Treatment

August 17, 1992

1090-1096

FAX to Lowenburg-Fitch Re: Additions/Deletions for Parking Garage

October 22, 1992

1097-1099

Possible Changes to Specifications

 

1100-1103

Letter to Howard Katz Re: Cost Breakdown of Parking Deck

January 21, 1993

1104-1106

Housing Estimate

November 24, 1992

1107-1108

Pricing Related to Garage

 

1109-1124

Capital Advance Program: Construction Contract Cost Plus

 

1125

List of Paint Colors to be Used

October 19, 1995

1126-1131

FAX to Roger Gillette Re: Paint Colors

September 19, 1995

1132-1134

Color Chart of Paints

 

1135

Note of Whether or Not Flat or Enamel Paint is to be Used

August 29, 1995

1136-1139

FAX to Ron of Gayton Painting Re: Paint colors to be Used

August 24, 1995

1140-1141

Copy of File Folder Cover With Contractor Information

 

1142-1149

Contract Between Walton Company and Russ Pershing Construction No. 126-1-1

December 26, 1996

1150-1158

Contract Between Walton Company and Pacific Structural Concrete No. 18-126-1-1

January 10, 1995

1159

Proposal from Russ Pershing Construction for concrete

December 13, 1995

1160-1164

Cancelled contract between The Walton Company and Progressive Concrete No. 126-1-1

October 26, 1995

1165-1166

FAX bid from Progressive Concrete

November 28, 1995

1167-1169

FAX from Langston Concrete

 

1170-1175

Cancelled contract between The Walton Company and Pacific Structures Construction

August 16, 1995

1176-1178

Short form contract agreement between The Walton Company and DJ Construction

April 23, 1997

1179

Copy of phone message memos

August 11

1180-1183

FAX to Clyde Anderson Re: Costs for sidewalks and curbs

August 30, 1994

1184

Note Re: dowels for block walls

 

1185-1190

Contract between The Walton Company and Pacific Structural Concrete No. 18-126-1-1

January 10, 1995

1191-1208

Section 03300 for Cast-In-Place Concrete

 

1207-1212

Section 03320 for Concrete Flooring Topping

 

1213

Post it note with phone number

 

1214-1215

Notes on Pershing and Merli Pumping

 

1216-1218

FAX to Walton Company Re: Cement Mixtures

December 13, 1995

1219-1220

Letter to Walton Company Re: Submittals from Progressive Concrete

November 16, 1995

1221-1230

MSDS sheets

 

1231

Expansion Joint Filler Data Sheet

 

1232

Concrete Properties sheet

November 14, 1995

1233

Grace Microfiber data sheet

 

1234-1244

Contract between The Walton Company and Insulcrete No. 27-126-1-6

January 25, 1995

1245

Request for contract approval for Insulcrete

 

1246-1247

Insulcrete proposal

January 23, 1995

1248-1251

Letter of transmittal Roger Gillette Re: concrete mix design

June 26, 1995

1252-1256

Approved submittal from Insulcrete

May 17, 1995

1257-1258

ICBO evaluation of Lite-Crete

 

1259-1262

Lite-Crete Brochure

 

1263-1264

Proposal from Insulcrete

January 23, 1995

1265-1266

MSDS sheets Lite-Crete foam concentrate

 

1267-1268

Transmittal from Insulcrete

May 8, 1995

1269-1270

ICBO Evaluation of Lite-Crete

 

1271-1275

Lite-Crete Brochure

 

1276-1279

Section 03320 Concrete Flooring Topping

 

1280-1293

Insulcrete Proposal

October 13, 1994

1294

Sea-Foamed Proposal

June 6, 1992

1295-1297

Cell Crete Proposal

January 23, 1995

1298-1301

Aero-Crete Proposal

November 20, 1992

1302-1303

S&W Concrete Proposal

January 11, 1993

1304-1309

Permafloors Proposal

March 4, 1993

1310-1315

Test Results from Insulcrete

September 20, 1995

1316-1356

Preliminary Report on Issuance of Insurance

April 9, 1996

1357-1396

Preliminary Report on Issuance of Insurance

March 22, 1996

1397-1487

Zoning Ordinance

 

1488

FAX to Howard Katz Re: Location adjustments

July 26, 1994

1489-1491

Summary of compression test data for concrete

May 17,1995

1492-1495

Summary of compression test data for concrete

May 16, 1995

1496-1500

Report of reinforcing steel tests

April 25, 1995

1501-1504

Summary of compression test data for concrete

May 1, 1995

1504-1509

Summary of compression test data for concrete

April 17, 1995

1510-1514

Summary of compression test data for concrete

April 9, 1995

1515-1519

Summary of compression test data for concrete

April 9, 1995

1520-1526

Report of reinforcing steel tests

March 3, 1995

1527-1531

Summary of compression test data for concrete

March 27, 1995

1532-1550

Summary of compression test data for concrete

March 9, 1995

1551-1564

Summary of compression test data for concrete

March 4, 1995

1565-1567

Summary of compression test data for concrete

February 25, 1995

1568-1572

Summary of compression test data for concrete

February 17, 1995

1573-1576

Summary of compression test data for concrete

February17, 1995

1577-1579

Summary of compression test data for concrete

February 13, 1995

1580-1590

Summary of compression test data for concrete

January 9, 1995

1591-1594

Summary of compression test data for concrete

January 29, 1995

1595-1598

Summary of compression test data for concrete

January 27, 1995

1599-1605

Summary of compression test data for concrete

January 21, 1995

1606-1608

Report of concrete core tests

December 12, 1994

1609-1611

Summary of compression test data for concrete

January 6, 1995

1612-1618

Report of reinforcing steel tests

December 30, 1994

1619-1637

Summary of compression test data and core test for concrete

December 12, 1994

1638-1652

Summary of compression test data for concrete

December 17, 1994

1653-1655

Summary of compression test data for concrete

December 6, 1994

1656-1660

Summary of compression test data for concrete

December 3, 1994

1661-1665

Summary of compression test data for concrete

December 3, 1994

1666-1670

Summary of compression test data for concrete

November 25, 1994

1671-1677

Summary of compression test data for concrete

November 18, 1994

1678-1682

Report of reinforcing steel tests

November 21, 1994

1683-1692

Summary of compression test data for concrete

November 9, 1994

1693-1695

Summary of compression test data for concrete

November 9, 1994

1696-1698

Summary of compression test data for concrete

October 27, 1994

1699-1701

Summary of compression test data for concrete

October 24, 1994

1702-1704

Summary of compression test data for concrete

October 24, 1994

1705-1707

Summary of compression test data for concrete

October 24, 1994

1708-1710

Summary of compression test data for concrete

October 24, 1994

1711-1713

Summary of compression test data for concrete

October 24, 1994

1714-1716

Summary of compression test data for concrete

October 13, 1994

1717-1719

Summary of compression test data for concrete

October 13, 1994

1720-1722

Summary of compression test data for concrete

October 5, 1994

1723-1725

Summary of compression test data for concrete

October 2, 1994

1726-1728

Summary of compression test data for concrete

September 26, 1994

1729-1730

Summary of compression test data for concrete

September 21, 1994

1731-1733

Summary of compression test data for concrete

September 21, 1994

1734

Folder cover with subcontractor and addenda sent dates

 

1735-1742

Addenda to sub-contract with J&C Construction

February 2, 1996

1743-1754

Contract between the Walton Company and J&C Construction No. 16-126-4-1

December 13, 1994

1755-1756

Addendum to sub-contract agreement between J&C Construction and The Walton Company

January 13, 1995

1757-1759

List of bids and request for contractor approval

December 21, 1993

1760-1761

Response to request for cost impact

July 10, 1995

1762-1765

Addenda to sub-contract agreement between J&C construction and The Walton Company w/ change orders 3401, 3403, 3404, 3405

February 2, 1996

1766-1770

Addenda to sub-contract agreement between J&C construction and The Walton Company w/ change orders 3401, 3403, 3404, 3405

January 29, 1996

1771

Response to request for cost impact

October 24, 1995

1772-1775

FAX to John Holmes Re: Response to request for cost impact

October 18, 1995

1776-1777

FAX to Patty Re: response to request for cost impact

October 25, 1995

1778-1783

Response to request for cost impact

September 25, 1995

1784-1785

Response to request for cost impact w/ materials list

June 28, 1995

1786-1787

Response to request for cost impact w/ materials list

June 28, 1995

1788-1790

Response to request for cost impact w/ schedule of values and addenda B

June 27, 1995

1791

Letter of transmittal Re: Deltas 4-6

August 29, 1994

1792

Inter departmental correspondence Re: Stair construction clarification

November 7, 1990

1793-1800

Job Meeting #36

May 23, 1995

1801-1802

Letter between The Walton Company and J&C Construction Re: Delta 6 additional costs

May 8, 1995

1803-1804

Response to request for cost impact

February 14, 1995

1805-1807

Letter to Tom Gibson Re: Price reductions

December 9, 1994

1808

Transmittal form to J&C Construction Re: A&S plans

March 23, 1995

1809

Response to request for cost impact from John Holmes

February 28, 1995

1810-1814

Transmittal to Tom Gibson Re: Request for information

February 21, 1995

1815-1816

Letter to Tom Gibson Re: requested information

February, 13, 1995

1817-1819

Letter to Tom Gibson Re: Requested information

February 13, 1995

1820-1824

Information from Rent a Walk for pedestrian walkway

February 2, 1995

1825-1835

Subcontract agreement addendum for J&C Construction

January 20, 1995

1836-1837

FAX to Ande Contractors

December 28, 1994

1838-1845

FAX to Tom Gibson Re: Current projects of Ande Contractors

December 7, 1994

1846-1850

FAX to Al Allsbrook Re: Bolt Prices

December 27, 1994

1851-1861

Lumber proposal from J&C Construction

December 12, 1994

1862

FAX cover sheet to Ed Holmes No fax attached

November 14, 1994

1863-1864

FAX trans reports and cover sheet Re: Deltas 5-7 no fax attached

December 1, 1994

1865-1868

Section 06100 Rough Carpentry

 

1869

Notes on Rough Carpentry Budget

 

1870

Rough carpentry and lumber proposal from J&C Construction

June 20, 1994

1871

Response to request for cost impact from John Holmes

September 19, 1995

1872-1875

Transmittal to New West Framing Re: Deltas 4-6

August 29, 1994

1876-1877

Lumber and labor proposal from New West Framing

March 5, 1993

1878

Transmittal to Concorde Building Corporation Re: Deltas 4-6

August 29, 1994

1879-1888

Proposal for rough framing from Concorde Building Corporation

March 12, 1993

1889

Letter of transmittal to Lee Bolin Re: Deltas 4-6

August 29, 1994

1890-1892

Proposal for rough framing from Lee Bolin

December 9, 1993

1893-1895

Proposal for rough framing from Lee Bolin

March 9, 1993

1896-1897

Proposal for rough framing from Lee Bolin

October 5, 1992

1899-1902

Proposal for rough framing from Lee Bolin

April 13, 1992

1903-1905

Proposal for rough framing from Lee Bolin

October 5, 1992

1906-1908

Proposal for rough framing from Lee Bolin

March 9, 1993