******** Document Index for The Walton Company
Cynthia
Coulter Mulvihill, Esq. SBN 171909
|
|
SHERMAN OAKS SENIOR CITIZEN HOUSING CORPORATION, et al.,
Plaintiffs,
v.
THE WALTON ASSOCIATED COMPANIES, et al.,
Defendants. _________________________________
AND RELATED CROSS ACTIONS.
|
) |
CASE NO.: BC 228212
THE WALTON COMPANY’S NOTICE OF PARTIAL COMPLIANCE RE DOCUMENTS DEPOSITED PURSUANT TO CASE MANAGEMENT ORDER
|
INDEX OF DOCUMENTS DEPOSITED
|
Bates No. |
Description |
Date |
|
1-10 |
Job Meeting #19 |
December 6, 1994 |
|
11-19 |
Job Meeting #18 |
November 29, 1994 |
|
20-28 |
Job Meeting #17 |
November 22, 1994 |
|
29-36 |
Job Meeting #15 |
November 1, 1994 |
|
37-44 |
Job Meeting #14 |
October 25,1994 |
|
45-53 |
Job Meeting #13 |
October 18, 1994 |
|
54-62 |
Job Meeting #12 |
October 11, 1994 |
|
63-71 |
Job Meeting #11 |
October 4, 1994 |
|
72-81 |
Job Meeting #8 |
September 13, 1994 |
|
82-90 |
Job Meeting #7 |
September 6, 1994 |
|
91-101 |
Job Meeting #6 |
August 30, 1994 |
|
102-111 |
Job Meeting #5 |
August 23, 1994 |
|
112-116 |
Job Meeting #4 |
August 16, 1994 |
|
117-121 |
Job Meeting #4 |
August 16, 1994 |
|
122-129 |
Job Meeting #3 |
August 9, 1994 |
|
130-139 |
Job Meeting #2 |
July 19, 1994 |
|
140-145 |
Job Meeting #1 |
July 19, 1994 |
|
146-153 |
Job Meeting #44 |
July 25, 1995 |
|
154-162 |
Job Meeting #42 |
July 11, 1995 |
|
163-171 |
Job Meeting #40 |
June 27 1995 |
|
172-180 |
Job Meeting #38 |
June 6, 1995 |
|
181-188 |
Job Meeting #37 |
May 30, 1995 |
|
189-196 |
Job Meeting #35 |
May 9, 1995 |
|
197-204 |
Job Meeting #34 |
May 2, 1995 |
|
205-212 |
Job Meeting #32 |
April 18, 1995 |
|
213-220 |
Job Meeting #30 |
March 7, 1995 |
|
221-228 |
Job Meeting #29 |
February 28, 1995 |
|
229-236 |
Job Meeting #28 |
February 21, 1995 |
|
237-244 |
Job Meeting #27 |
February 14, 1995 |
|
245-252 |
Job Meeting #26 |
February 7, 1995 |
|
253-260 |
Job Meeting #25 |
January 24, 1995 |
|
261-268 |
Job Meeting #24 |
January 17, 1995 |
|
269-276 |
Job Meeting #23 |
January 3, 1995 |
|
277-284 |
Job Meeting #22 |
December 27, 1994 |
|
285-292 |
Job Meeting #21 |
December 20, 1994 |
|
293-301 |
Job Meeting #20 |
December, 13, 1994 |
|
302-309 |
Job Meeting #65 |
January 23, 1995 |
|
310-317 |
Job Meeting #62 |
December 12, 1995 |
|
318-326 |
Job Meeting #61 |
December 5, 1995 |
|
327-334 |
Job Meeting #59 |
November 14, 1995 |
|
335-342 |
Job Meeting #56 |
October 31, 1995 |
|
343-350 |
Job Meeting #54 |
October 17, 1995 |
|
351-358 |
Job Meeting #53 |
October 10, 1995 |
|
359-366 |
Job Meeting #52 |
October 3, 1995 |
|
367-375 |
Job Meeting #51 |
September 19, 1995 |
|
376-384 |
Job Meeting #49 |
August 29, 1995 |
|
385-392 |
Job Meeting #48 |
August 29, 1995 |
|
393-400 |
Job Meeting #47 |
August 22, 1995 |
|
401-408 |
Job Meeting #46 |
August 8, 1995 |
|
409-416 |
Job Meeting #45 |
August 8, 1995 |
|
417-460 |
General Decision Number CA940002 |
May 23, 1994 |
|
461-466 |
Phase II (Housing) Other Fees |
December 27, 1993 |
|
467-472 |
Phase II (Housing) Other Fees |
December 27, 1993 |
|
473 |
Letter from Alan Ross to Clyde Anderson |
May 9, 1994 |
|
474-477 |
FAX to Alan Ross from Clyde Anderson |
May, 18, 1994 |
|
478 |
Phase I (Garage) Other Fees |
May 17, 1993 |
|
479 |
Phase I (Housing) Other Fees |
May 17, 1993 |
|
480-481 |
Exhibit “F” Promissory Note |
April 15, 1994 |
|
482 |
Exhibit “C” Residual Receipts Note |
|
|
483-484 |
Rider “A” |
April 14, 1993 |
|
485-521 |
Const. Loan Agreement Between LA and Sherman Oaks Services |
April 15, 1994 |
|
522 |
FAX from Alan Ross to Clyde Anderson |
June 1, 1994 |
|
523-526 |
FAX to Alan Ross from Clyde Anderson |
May 16, 1994 |
|
527 |
FAX cover to Howard Katz from Clyde |
|
|
528-533 |
Phase II (Housing) Other Fees |
December 27, 1993 |
|
534-539 |
Phase II (Housing) Other Fees |
December 27, 1993 |
|
540-545 |
Phase II (Housing) Other Fees |
December 27, 1993 |
|
546-551 |
Phase II (Housing) Other Fees |
December 27, 1993 |
|
552-557 |
Phase II (Housing) Other Fees |
December 27, 1993 |
|
558-563 |
Phase II (Housing) Other Fees |
December 27, 1993 |
|
564-569 |
Phase II (Housing) Other Fees |
December 27, 1993 |
|
570-575 |
Phase II (Housing) Other Fees |
December 27, 1993 |
|
576-581 |
Phase II (Housing) Other Fees |
December 27, 1993 |
|
582-587 |
Phase II (Housing) Other Fees |
December 27, 1993 |
|
588-590 |
FAX to Howard Katz From Clyde Anderson |
June 21, 1993 |
|
591-593 |
FAX to Howard Katz from Clyde Anderson |
June 18, 1993 |
|
594 |
Exhibit “E” Schedule of Approved Total Development Costs and Funding Sources |
January 5, 1994 |
|
595 |
Exhibit “D” Schedule of Performance |
May 17, 1993 |
|
596-598 |
FAX to Howard Katz Re: Installation of Utilities |
October 27, 1994 |
|
599-602 |
FAX to Howard Katz Re: Installation of Utilities |
October 27, 1994 |
|
603-605 |
Sub Contractor Control Forms |
March 6, 1995 |
|
606-607 |
Sub Contractor Control Forms |
March 3, 1995 |
|
608 |
Sub Contractor Control Forms |
January 23, 1995 |
|
609-610 |
Sub Contractor Control Forms |
February 27, 1995 |
|
611-612 |
Sub Contractor Control Forms |
January 23, 1995 |
|
613 |
Projected Offsite Cost |
June 9, 1993 |
|
614 |
Housing and Urban Development (Contractors / Mortgagor’s Cost Breakdown) |
July 15, 1992 |
|
615-616 |
FAX to Federal Housing Commissioner Re: Request for Construction Changes (Fire Sprinklers) |
March 8, 1995 |
|
617 |
Letter to Howard Katz Re: Parking Structure |
March 8, 1995 |
|
618-620 |
Sub Contractor Control Form |
March 6, 1995 |
|
621 |
Request for Construction Changes on Project Mortgages Re: Lavatories |
|
|
622 |
Request for Construction Changes on Project Mortgages Re: Framing Contract for Delta 6 |
|
|
623-626 |
Sub Contractor Control Forms |
March 6, 1995 |
|
627-629 |
Letter to Howard Katz Re: Changes to form 2328 with attachments |
January 21, 1994 |
|
630 |
Form 2328 (Contractors / Mortgagor’s Cost Breakdown |
December 28, 1993 |
|
631 |
Projected Offsite Costs |
June 9, 1993 |
|
632 |
Form 2328 (Contractors / Mortgagor’s Cost Breakdown |
December 28, 1993 |
|
633 |
Projected Offsite Costs |
June 9, 1993 |
|
634-638 |
Dickens Senior Housing Estimate |
May 20, 1993 |
|
639 |
Letter to Howard Katz Re: Cash Flow Requirements and Schedules |
May 20, 1993 |
|
640-643 |
Attachment to 639 (Dickens Senior Housing Estimate) |
May 20, 1993 |
|
644-647 |
Attachment to 639 (Schedule) |
May 19, 1993 |
|
648 |
From 2328 (Contractors / Mortgagor’s Cost Breakdown) |
April 26, 1993 |
|
649 |
Projected Offsite Cost |
April 26, 1993 |
|
650 |
Letter to Howard Katz Re: Form 2328 |
April 26, 1993 |
|
651-653 |
Dickens Senior Housing Estimate |
April 26, 1993 |
|
654-656 |
Dickens Senior Housing Estimate |
April 5, 1993 |
|
657 |
Projected Offsite Costs |
April 4, 1993 |
|
658-660 |
Housing Estimate |
April 5, 1993 |
|
661-671 |
Letter to Howard Katz Re: Other Fees (11 Copies) |
April 1, 1993 |
|
672-674 |
Housing Estimate |
April 5, 1993 |
|
675 |
Projected Offsite Costs |
April 1, 1993 |
|
676-682 |
Letter of Transmittal of form 2328, Housing Estimate, and projected Offsite Costs to Howard Katz |
April 9, 1993 |
|
683-686 |
Housing Estimate |
April 1, 1993 |
|
687-690 |
Housing Estimate |
April 1, 1993 |
|
691-692 |
Garage Cost Adjustment |
March 31, 1993 |
|
693 |
Form 2328 (Contractor / Mortgagor’s Cost Breakdown) |
November 24, 1992 |
|
694-695 |
Bonds (Garages) |
|
|
696-697 |
Letter to Howard Katz Re: Other Fees w/ Attachment of Projected Offsite Costs |
November 20, 1992 |
|
698-700 |
Housing Estimate |
November 24, 1992 |
|
701 |
Letter to Howard Katz Re: Cost Estimate |
June 25, 1992 |
|
702-704 |
Housing Estimate Attached to 701 |
June 22, 1992 |
|
705 |
Letter from Lynn & Schaller Insurance Re: Bond Approval Attached to 701 |
May 1, 1992 |
|
706-720 |
Form 2328 (Contractor / Mortgagor’s Cost Breakdown) |
July 15, 1992 |
|
721-723 |
Housing Estimate |
June 22, 1992 |
|
724-725 |
Letter to Howard Katz Re: Other Fees w/ Attachments |
December 15, 1992 |
|
726 |
Letter to Alan Ross Re: Liability Insurance |
May 2, 1994 |
|
727 |
Sub Contractor Control Form |
March 6, 1995 |
|
728-752 |
Construction Contract |
June 6, 1994 |
|
753-762 |
Housing Estimate and Schedule to Howard Katz via FAX |
May 20, 1993 |
|
763-772 |
Cost Breakdown, Other Fees, and Housing Estimate to Alan Ross via FAX |
June 13, 1994 |
|
773-775 |
Plan Check and Assignments Checklist to Howard Katz |
April 5, 1994 |
|
776 |
Letter to Howard Katz Re: Church parking for Garage |
April 5, 1994 |
|
777 |
Tax Registration Certificate |
February 26, 1994 |
|
778-785 |
Grading Permit Application and Import Export Documents |
April 12, 1994 |
|
786-788 |
FAX to Alan Ross Re: Estimate Job Sheets |
June 15, 1994 |
|
789-794 |
Housing Garage Time Table |
|
|
795 |
Exhibit “E” (Schedule of Approved Total Development Costs) |
May 5, 1994 |
|
796-797 |
Closing Document Checklist for Parking Garage |
June 14, 1994 |
|
798 |
Offsite Demolition Contract |
|
|
799-807 |
Construction Contract |
June 15, 1994 |
|
808-813 |
Housing Garage Time Table |
|
|
814-816 |
Concrete Time Table |
April 26, 1994 |
|
817 |
Phase II Housing Other Fees |
|
|
818-822 |
Housing Estimate |
December 27, 1993 |
|
823-824 |
FAX Re: Funding |
March 9, 1994 |
|
825 |
Projected Offsite Cost |
December 27, 1993 |
|
826-831 |
Letter of Transmittal with Form 2328, Housing Estimate, and Projected Offsite Costs |
April 15, 1993 |
|
832-833 |
Project Contact Form |
April 7, 1994 |
|
834-837 |
Letter to Howard Katz Re: Minority Certified Contractors |
July 6, 1993 |
|
838 |
Subcontractor Survey Form (Blank) |
|
|
839-842 |
Letter of Transmittal to Julia Copely Re: Minority Contractors |
July 6, 1993 |
|
843-847 |
Housing Estimate |
May 20, 1993 |
|
848 |
Projected Offsite Costs |
April 8, 1993 |
|
849 |
Contractor / Mortgagor’s Cost Breakdown |
April 26, 1993 |
|
850 |
Projected Offsite Costs |
April 26, 1993 |
|
851-853 |
Housing Estimate |
April 7, 1993 |
|
854-856 |
FAX to Howard Katz Re: Projected Offsite Costs (Revised) |
April 8, 1993 |
|
857 |
Contractors / Mortgagor’s Cost Breakdown |
June 14, 1993 |
|
858-861 |
FAX to Carolyn of Menorah Form 2328 and Projected Offsite Cost |
December 28, 1993 |
|
862 |
Letter to Howard Katz Re: Additional Drywall for Soundproofing |
December 27, 1993 |
|
863-867 |
Housing Estimate |
December 27, 1993 |
|
868 |
Contractors / Mortgagor’s Cost Breakdown |
December 28, 1993 |
|
869 |
Projected Offsite Costs |
June 9, 1993 |
|
870 |
Contractors / Mortgagor’s Cost Breakdown |
December 28, 1993 |
|
871 |
Projected Offsite Costs |
June 9, 1993 |
|
872 |
Phase II (Housing) Other Fees |
|
|
873 |
Projected Offsite Costs |
June 9, 1993 |
|
874-878 |
Housing Estimate |
December 27, 1993 |
|
879 |
Contractors / Mortgagor’s Cost Breakdown |
December 28, 1993 |
|
880 |
Projected Offsite Costs |
June 9, 1993 |
|
881 |
Phase II (Housing) Other Fees |
|
|
882 |
Projected Offsite Costs |
June 9, 1993 |
|
883-887 |
Housing Estimate |
December 27, 1993 |
|
888 |
Letter to Howard Katz Re: Sheet Plans |
December 13, 1993 |
|
889 |
Contractors / Mortgagor’s Cost Breakdown |
November 30, 1993 |
|
890-891 |
FAX of Housing Estimate |
June 10,1993 |
|
892-893 |
Housing Estimate |
December 2, 1993 |
|
894 |
Offsite Housing Costs |
November 30, 1993 |
|
895 |
Contractors / Mortgagor’s Cost Breakdown |
November 30, 1993 |
|
896-897 |
Letter of Transmittal to Howard Katz Re: Form 2328 |
June 14, 1993 |
|
898-899 |
Projected Offsite Costs |
June 9, 1993 |
|
900 |
Cash Flow Estimate |
June 10, 1993 |
|
901-902 |
FAX to Laury Chasin Re: Senior Housing (Pages Missing) |
April 8, 1993 |
|
903-905 |
FAX to Howard Katz Re: Projected Offsite Costs |
April 8, 1993 |
|
906-907 |
FAX to Howard Katz Re: Submittal of Documents |
August 3, 1993 |
|
908 |
FAX to Clyde Anderson Re: Parking Issues |
August 10, 1993 |
|
909-912 |
FAX to Laury Chasin Re: Projected Offsite Costs |
August 4, 1993 |
|
913 |
Contractors / Mortgagor’s Cost Breakdown |
April 26, 1993 |
|
914 |
Projected Offsite Cost |
April 26, 1993 |
|
915 |
Contractors / Mortgagor’s Cost Breakdown |
December 27, 1993 |
|
916 |
Projected Offsite Cost |
June 9, 1993 |
|
917 |
Contractors / Mortgagor’s Cost Breakdown |
December 27, 1993 |
|
918 |
Letter of Transmittal (No Attachment) |
December 27, 1993 |
|
919 |
Letter of Transmittal (No Attachment) |
December 30, 1993 |
|
920 |
Letter to Howard Katz Re: Reimbursement of Costs |
October 18, 1993 |
|
921 |
Offsite Costs (HUD Garage) |
|
|
922-927 |
Letter to Howard Katz Re: Spread sheet (enclosure: Housing Estimate) |
December 23, 1993 |
|
928 |
Projected Offsite Costs |
April 8, 1993 |
|
929 |
Contractors / Mortgagor’s Cost Breakdown |
June 14, 1993 |
|
930-931 |
Schedule Timeline |
March 31, 1993 |
|
932-933 |
Garage Costs |
March 31, 1993 |
|
934 |
Letter to Joe Hirsh Re: Rising Lumber Costs |
April 5, 1993 |
|
935 |
Contractors / Mortgagor’s Cost Breakdown |
April 5, 1993 |
|
936 |
Projected Offsite Costs |
April 1, 1993 |
|
937-942 |
Framing Proposal from Lee Bolin & Associates |
October 5, 1992 |
|
943-948 |
Housing Estimate |
April 5, 1993 |
|
949 |
Projected Offsite Costs |
April 8, 1993 |
|
950-951 |
Parking Structure Costs |
April 1, 1993 |
|
952-953 |
Sub Contractor Control Form |
March 6, 1995 |
|
954-956 |
FAX to Laury Chasin Re: Garage Costs |
March 29, 1993 |
|
957 |
Projected Offsite Costs |
November 18, 1992 |
|
958-961 |
Plan Changes for Delta 1 Spec Change |
November 24, 1992 |
|
962 |
Offsite Costs Attributed to HUD garage |
|
|
963-965 |
Contractors / Mortgagor’s Cost Breakdown |
November 24, 1992 |
|
966-979 |
Job Cost Report |
March 10, 1993 |
|
980-984 |
FAX’s of Letter to Joe Hirsch Re: Rising Lumber Costs |
April 5, 1993 |
|
985-990 |
FAX to Howard Katz and Jack Parrish Re: Pricing Requested |
November 6, 1992 |
|
991-993 |
Housing Estimate |
November 24, 1992 |
|
994-997 |
Memorandum of Plan Changes to Bill Raymond Sr. |
November 24, 1992 |
|
998-1001 |
Memorandum of Plan Changes to Bill Raymond Sr. |
November 24, 1992
|
|
1002-1008 |
Quotes for Lower Garage Concrete, Electric, Sprinklers |
|
|
1009-1013 |
Contractors / Mortgagor’s Cost Breakdown |
November 24, 1992 |
|
1014-1028 |
Job Cost Report |
January 15, 1993 |
|
1029-1043 |
Job Cost Report |
November 16, 1992 |
|
1044-1046 |
Housing Estimate |
November 24, 1992 |
|
1047-1050 |
Letter to Howard Katz Re: Cost Breakdown of Parking Structure |
January 21, 1993 |
|
1051-1052 |
FAX to Howard Katz Re: Form 2328 Revision |
November 24, 1992 |
|
1053-1054 |
Letter of Transmittal to Howard Katz Re: Projected Costs |
November 24, 1992 |
|
1055-1057 |
Housing Estimate |
November 24, 1992 |
|
1058-1060 |
Housing Estimate |
November 24, 1992 |
|
1061 |
List of Appliances |
September 23, 1992 |
|
1062 |
Letter to Howard Katz Re: Possible Savings |
June 22, 1992 |
|
1063-1067 |
Memorandum to William Raymond Jr. Re: Letter from city of LA and Civil Engineer |
|
|
1068-1069 |
FAX to Clyde Anderson Re: Security System |
November 10, 1992 |
|
1070 |
Letter to Clyde Anderson Re: Request to Modify Details of Concrete |
September 11, 1992 |
|
1071-1072 |
Handrail Bracket Data Sheets |
|
|
1073-1074 |
Heat Pump Details/Drawings |
|
|
1075 |
Letter to Howard Katz Re: Possible Cost Savings |
June 22, 1992 |
|
1076 |
Possible Changes to Specifications |
|
|
1077-1083 |
Letter to Howard Katz Re: Concerns in Bidding Plans |
June 18, 1992 |
|
1084-1085 |
Price Additions and Savings |
|
|
1086-1087 |
Extra Items List |
October 6, 1992 |
|
1088-1089 |
Section 12500: Window Treatment |
August 17, 1992 |
|
1090-1096 |
FAX to Lowenburg-Fitch Re: Additions/Deletions for Parking Garage |
October 22, 1992 |
|
1097-1099 |
Possible Changes to Specifications |
|
|
1100-1103 |
Letter to Howard Katz Re: Cost Breakdown of Parking Deck |
January 21, 1993 |
|
1104-1106 |
Housing Estimate |
November 24, 1992 |
|
1107-1108 |
Pricing Related to Garage |
|
|
1109-1124 |
Capital Advance Program: Construction Contract Cost Plus |
|
|
1125 |
List of Paint Colors to be Used |
October 19, 1995 |
|
1126-1131 |
FAX to Roger Gillette Re: Paint Colors |
September 19, 1995 |
|
1132-1134 |
Color Chart of Paints |
|
|
1135 |
Note of Whether or Not Flat or Enamel Paint is to be Used |
August 29, 1995 |
|
1136-1139 |
FAX to Ron of Gayton Painting Re: Paint colors to be Used |
August 24, 1995 |
|
1140-1141 |
Copy of File Folder Cover With Contractor Information |
|
|
1142-1149 |
Contract Between Walton Company and Russ Pershing Construction No. 126-1-1 |
December 26, 1996 |
|
1150-1158 |
Contract Between Walton Company and Pacific Structural Concrete No. 18-126-1-1 |
January 10, 1995 |
|
1159 |
Proposal from Russ Pershing Construction for concrete |
December 13, 1995 |
|
1160-1164 |
Cancelled contract between The Walton Company and Progressive Concrete No. 126-1-1 |
October 26, 1995 |
|
1165-1166 |
FAX bid from Progressive Concrete |
November 28, 1995 |
|
1167-1169 |
FAX from Langston Concrete |
|
|
1170-1175 |
Cancelled contract between The Walton Company and Pacific Structures Construction |
August 16, 1995 |
|
1176-1178 |
Short form contract agreement between The Walton Company and DJ Construction |
April 23, 1997 |
|
1179 |
Copy of phone message memos |
August 11 |
|
1180-1183 |
FAX to Clyde Anderson Re: Costs for sidewalks and curbs |
August 30, 1994 |
|
1184 |
Note Re: dowels for block walls |
|
|
1185-1190 |
Contract between The Walton Company and Pacific Structural Concrete No. 18-126-1-1 |
January 10, 1995 |
|
1191-1208 |
Section 03300 for Cast-In-Place Concrete |
|
|
1207-1212 |
Section 03320 for Concrete Flooring Topping |
|
|
1213 |
Post it note with phone number |
|
|
1214-1215 |
Notes on Pershing and Merli Pumping |
|
|
1216-1218 |
FAX to Walton Company Re: Cement Mixtures |
December 13, 1995 |
|
1219-1220 |
Letter to Walton Company Re: Submittals from Progressive Concrete |
November 16, 1995 |
|
1221-1230 |
MSDS sheets |
|
|
1231 |
Expansion Joint Filler Data Sheet |
|
|
1232 |
Concrete Properties sheet |
November 14, 1995 |
|
1233 |
Grace Microfiber data sheet |
|
|
1234-1244 |
Contract between The Walton Company and Insulcrete No. 27-126-1-6 |
January 25, 1995 |
|
1245 |
Request for contract approval for Insulcrete |
|
|
1246-1247 |
Insulcrete proposal |
January 23, 1995 |
|
1248-1251 |
Letter of transmittal Roger Gillette Re: concrete mix design |
June 26, 1995 |
|
1252-1256 |
Approved submittal from Insulcrete |
May 17, 1995 |
|
1257-1258 |
ICBO evaluation of Lite-Crete |
|
|
1259-1262 |
Lite-Crete Brochure |
|
|
1263-1264 |
Proposal from Insulcrete |
January 23, 1995 |
|
1265-1266 |
MSDS sheets Lite-Crete foam concentrate |
|
|
1267-1268 |
Transmittal from Insulcrete |
May 8, 1995 |
|
1269-1270 |
ICBO Evaluation of Lite-Crete |
|
|
1271-1275 |
Lite-Crete Brochure |
|
|
1276-1279 |
Section 03320 Concrete Flooring Topping |
|
|
1280-1293 |
Insulcrete Proposal |
October 13, 1994 |
|
1294 |
Sea-Foamed Proposal |
June 6, 1992 |
|
1295-1297 |
Cell Crete Proposal |
January 23, 1995 |
|
1298-1301 |
Aero-Crete Proposal |
November 20, 1992 |
|
1302-1303 |
S&W Concrete Proposal |
January 11, 1993 |
|
1304-1309 |
Permafloors Proposal |
March 4, 1993 |
|
1310-1315 |
Test Results from Insulcrete |
September 20, 1995 |
|
1316-1356 |
Preliminary Report on Issuance of Insurance |
April 9, 1996 |
|
1357-1396 |
Preliminary Report on Issuance of Insurance |
March 22, 1996 |
|
1397-1487 |
Zoning Ordinance |
|
|
1488 |
FAX to Howard Katz Re: Location adjustments |
July 26, 1994 |
|
1489-1491 |
Summary of compression test data for concrete |
May 17,1995 |
|
1492-1495 |
Summary of compression test data for concrete |
May 16, 1995 |
|
1496-1500 |
Report of reinforcing steel tests |
April 25, 1995 |
|
1501-1504 |
Summary of compression test data for concrete |
May 1, 1995 |
|
1504-1509 |
Summary of compression test data for concrete |
April 17, 1995 |
|
1510-1514 |
Summary of compression test data for concrete |
April 9, 1995 |
|
1515-1519 |
Summary of compression test data for concrete |
April 9, 1995 |
|
1520-1526 |
Report of reinforcing steel tests |
March 3, 1995 |
|
1527-1531 |
Summary of compression test data for concrete |
March 27, 1995 |
|
1532-1550 |
Summary of compression test data for concrete |
March 9, 1995 |
|
1551-1564 |
Summary of compression test data for concrete |
March 4, 1995 |
|
1565-1567 |
Summary of compression test data for concrete |
February 25, 1995 |
|
1568-1572 |
Summary of compression test data for concrete |
February 17, 1995 |
|
1573-1576 |
Summary of compression test data for concrete |
February17, 1995 |
|
1577-1579 |
Summary of compression test data for concrete |
February 13, 1995 |
|
1580-1590 |
Summary of compression test data for concrete |
January 9, 1995 |
|
1591-1594 |
Summary of compression test data for concrete |
January 29, 1995 |
|
1595-1598 |
Summary of compression test data for concrete |
January 27, 1995 |
|
1599-1605 |
Summary of compression test data for concrete |
January 21, 1995 |
|
1606-1608 |
Report of concrete core tests |
December 12, 1994 |
|
1609-1611 |
Summary of compression test data for concrete |
January 6, 1995 |
|
1612-1618 |
Report of reinforcing steel tests |
December 30, 1994 |
|
1619-1637 |
Summary of compression test data and core test for concrete |
December 12, 1994 |
|
1638-1652 |
Summary of compression test data for concrete |
December 17, 1994 |
|
1653-1655 |
Summary of compression test data for concrete |
December 6, 1994 |
|
1656-1660 |
Summary of compression test data for concrete |
December 3, 1994 |
|
1661-1665 |
Summary of compression test data for concrete |
December 3, 1994 |
|
1666-1670 |
Summary of compression test data for concrete |
November 25, 1994 |
|
1671-1677 |
Summary of compression test data for concrete |
November 18, 1994 |
|
1678-1682 |
Report of reinforcing steel tests |
November 21, 1994 |
|
1683-1692 |
Summary of compression test data for concrete |
November 9, 1994 |
|
1693-1695 |
Summary of compression test data for concrete |
November 9, 1994 |
|
1696-1698 |
Summary of compression test data for concrete |
October 27, 1994 |
|
1699-1701 |
Summary of compression test data for concrete |
October 24, 1994 |
|
1702-1704 |
Summary of compression test data for concrete |
October 24, 1994 |
|
1705-1707 |
Summary of compression test data for concrete |
October 24, 1994 |
|
1708-1710 |
Summary of compression test data for concrete |
October 24, 1994 |
|
1711-1713 |
Summary of compression test data for concrete |
October 24, 1994 |
|
1714-1716 |
Summary of compression test data for concrete |
October 13, 1994 |
|
1717-1719 |
Summary of compression test data for concrete |
October 13, 1994 |
|
1720-1722 |
Summary of compression test data for concrete |
October 5, 1994 |
|
1723-1725 |
Summary of compression test data for concrete |
October 2, 1994 |
|
1726-1728 |
Summary of compression test data for concrete |
September 26, 1994 |
|
1729-1730 |
Summary of compression test data for concrete |
September 21, 1994 |
|
1731-1733 |
Summary of compression test data for concrete |
September 21, 1994 |
|
1734 |
Folder cover with subcontractor and addenda sent dates |
|
|
1735-1742 |
Addenda to sub-contract with J&C Construction |
February 2, 1996 |
|
1743-1754 |
Contract between the Walton Company and J&C Construction No. 16-126-4-1 |
December 13, 1994 |
|
1755-1756 |
Addendum to sub-contract agreement between J&C Construction and The Walton Company |
January 13, 1995 |
|
1757-1759 |
List of bids and request for contractor approval |
December 21, 1993 |
|
1760-1761 |
Response to request for cost impact |
July 10, 1995 |
|
1762-1765 |
Addenda to sub-contract agreement between J&C construction and The Walton Company w/ change orders 3401, 3403, 3404, 3405 |
February 2, 1996 |
|
1766-1770 |
Addenda to sub-contract agreement between J&C construction and The Walton Company w/ change orders 3401, 3403, 3404, 3405 |
January 29, 1996 |
|
1771 |
Response to request for cost impact |
October 24, 1995 |
|
1772-1775 |
FAX to John Holmes Re: Response to request for cost impact |
October 18, 1995 |
|
1776-1777 |
FAX to Patty Re: response to request for cost impact |
October 25, 1995 |
|
1778-1783 |
Response to request for cost impact |
September 25, 1995 |
|
1784-1785 |
Response to request for cost impact w/ materials list |
June 28, 1995 |
|
1786-1787 |
Response to request for cost impact w/ materials list |
June 28, 1995 |
|
1788-1790 |
Response to request for cost impact w/ schedule of values and addenda B |
June 27, 1995 |
|
1791 |
Letter of transmittal Re: Deltas 4-6 |
August 29, 1994 |
|
1792 |
Inter departmental correspondence Re: Stair construction clarification |
November 7, 1990 |
|
1793-1800 |
Job Meeting #36 |
May 23, 1995 |
|
1801-1802 |
Letter between The Walton Company and J&C Construction Re: Delta 6 additional costs |
May 8, 1995 |
|
1803-1804 |
Response to request for cost impact |
February 14, 1995 |
|
1805-1807 |
Letter to Tom Gibson Re: Price reductions |
December 9, 1994 |
|
1808 |
Transmittal form to J&C Construction Re: A&S plans |
March 23, 1995 |
|
1809 |
Response to request for cost impact from John Holmes |
February 28, 1995 |
|
1810-1814 |
Transmittal to Tom Gibson Re: Request for information |
February 21, 1995 |
|
1815-1816 |
Letter to Tom Gibson Re: requested information |
February, 13, 1995 |
|
1817-1819 |
Letter to Tom Gibson Re: Requested information |
February 13, 1995 |
|
1820-1824 |
Information from Rent a Walk for pedestrian walkway |
February 2, 1995 |
|
1825-1835 |
Subcontract agreement addendum for J&C Construction |
January 20, 1995 |
|
1836-1837 |
FAX to Ande Contractors |
December 28, 1994 |
|
1838-1845 |
FAX to Tom Gibson Re: Current projects of Ande Contractors |
December 7, 1994 |
|
1846-1850 |
FAX to Al Allsbrook Re: Bolt Prices |
December 27, 1994 |
|
1851-1861 |
Lumber proposal from J&C Construction |
December 12, 1994 |
|
1862 |
FAX cover sheet to Ed Holmes No fax attached |
November 14, 1994 |
|
1863-1864 |
FAX trans reports and cover sheet Re: Deltas 5-7 no fax attached |
December 1, 1994 |
|
1865-1868 |
Section 06100 Rough Carpentry |
|
|
1869 |
Notes on Rough Carpentry Budget |
|
|
1870 |
Rough carpentry and lumber proposal from J&C Construction |
June 20, 1994 |
|
1871 |
Response to request for cost impact from John Holmes |
September 19, 1995 |
|
1872-1875 |
Transmittal to New West Framing Re: Deltas 4-6 |
August 29, 1994 |
|
1876-1877 |
Lumber and labor proposal from New West Framing |
March 5, 1993 |
|
1878 |
Transmittal to Concorde Building Corporation Re: Deltas 4-6 |
August 29, 1994 |
|
1879-1888 |
Proposal for rough framing from Concorde Building Corporation |
March 12, 1993 |
|
1889 |
Letter of transmittal to Lee Bolin Re: Deltas 4-6 |
August 29, 1994 |
|
1890-1892 |
Proposal for rough framing from Lee Bolin |
December 9, 1993 |
|
1893-1895 |
Proposal for rough framing from Lee Bolin |
March 9, 1993 |
|
1896-1897 |
Proposal for rough framing from Lee Bolin |
October 5, 1992 |
|
1899-1902 |
Proposal for rough framing from Lee Bolin |
April 13, 1992 |
|
1903-1905 |
Proposal for rough framing from Lee Bolin |
October 5, 1992 |
|
1906-1908 |
Proposal for rough framing from Lee Bolin |
March 9, 1993 |